Crafted for the initial rollout of the AirTrunk JHB1 campus, Phase 1 establishes a state-of-the-art benchmark in hyperscale infrastructure by delivering over 50 megawatts of IT capacity across a master-planned 10.3-hectare site. Designed to seamlessly integrate massive artificial intelligence and high-performance computing workloads, this inaugural phase features advanced direct-to-chip liquid cooling technology, high-density server configurations, and an industry-leading power usage effectiveness. The architectural framework balances a striking, modern industrial aesthetic with robust technical redundancy, including dual substations and a 1-megawatt onsite rooftop solar array that anchors the facility’s commitment to cutting-edge sustainability.
Project Details
Building Use: Data Center Campus
Client: AirTrunk
Completion Date: 2024
Location: Johor Malaysia
Skills Needed: Planning, Masterplanning, Project Coordination